Hewitt&Carr were commissioned by the successful contractor to work alongside them to deliver these four starter industrial units on a prominent city road site. We carried out the project on a design and build basis, taking the original outline approval and working through RIBA work stages 4-8.

Our aim was to create a building which sat next to a larger industrial unit, utilising the same palette of materials to ensure a holistic design over the whole site.


We have worked with HCA over many years, they have a flair for design and can produce drawings at the speed and quality we need them on site. They are always very helpful and are willing to go that extra mile.

Contractor – Holland Construction

Customer: Goodwins PLC
Place: Stoke-on-Trent
Local Authority: Stoke-on-Tren City Council
Project Value: Not Disclosed